{"id":2628,"date":"2025-06-26T13:48:10","date_gmt":"2025-06-26T13:48:10","guid":{"rendered":"https:\/\/evecon.optimist.digital\/126-tonnine-hiigeltrafo-joudis-mandri-euroopa-suurimasse-akuparki-kiisal\/"},"modified":"2026-03-28T14:11:16","modified_gmt":"2026-03-28T14:11:16","slug":"baltijas-energetikas-nakotne-veidojas-igaunija","status":"publish","type":"post","link":"https:\/\/evecon.optimist.digital\/lv\/baltijas-energetikas-nakotne-veidojas-igaunija\/","title":{"rendered":"Baltijas ener\u0123\u0113tikas n\u0101kotne veidojas Igaunij\u0101"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\"><strong>Kontinent\u0101l\u0101s Eiropas liel\u0101k\u0101 akumulatoru parka izveid\u0113 sasniegta n\u0101kam\u0101 svar\u012bg\u0101 stadija.\r\nJ\u016bnija vid\u016b uz\u0146\u0113mums Baltic Storage Platform K\u012bsas objektam Igaunij\u0101 veiksm\u012bgi pieg\u0101d\u0101ja 126 tonnas smagu transformatoru, sperot n\u0101kamo lielo soli ce\u013c\u0101 uz \u0161\u012bs strat\u0113\u0123isk\u0101s ener\u0123\u0113tikas infrastrukt\u016bras nodo\u0161anu ekspluat\u0101cij\u0101.<\/strong><\/p>\r\n\r\n\r\n\r\n<p class=\"wp-block-paragraph\">Baltic Storage Platform ir kopuz\u0146\u0113mums, kuru izveidoju\u0161i Igaunijas ener\u0123\u0113tikas uz\u0146\u0113mums Evecon, Francijas saules ener\u0123ijas ra\u017eot\u0101js Corsica Sole un Mirova \u2013 ilgtsp\u0113j\u012bgu finan\u0161u jom\u0101 specializ\u0113ts akt\u012bvu p\u0101rvald\u012bt\u0101js, kas ietilpst Natixis Investment Managers grup\u0101. Kop\u0101 tie Harju apri\u0146\u0137\u012b b\u016bv\u0113 liela m\u0113roga akumulatoru parku ar 100 MW un 200 Mwh kop\u0113jo jaudu. Pl\u0101nots, ka parks ekspluat\u0101cij\u0101 tiks nodots 2025. gada ruden\u012b.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>Akumulatoru parka izveidi \u012bsteno \u010detru uz\u0146\u0113mumu apvien\u012bba: Connecto b\u016bv\u0113 augstsprieguma apak\u0161staciju, Energel pieg\u0101d\u0101 augstsprieguma transformatoru, NIDEC nodro\u0161ina akumulatoru tehnolo\u0123ijas, bet WiSo Engineering veic gan visp\u0101r\u0113jos b\u016bvniec\u012bbas, gan elektroinstal\u0101cijas un mont\u0101\u017eas darbus.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>Milz\u012bgais transformators, kas sare\u017e\u0123\u012bt\u0101 lo\u0123istikas oper\u0101cij\u0101 tika pieg\u0101d\u0101ts no Turcijas, b\u016bs centr\u0101lais elements t\u012bkla frekvences regul\u0113\u0161an\u0101 un Baltijas valstu ener\u0123\u0113tisk\u0101s dro\u0161\u012bbas stiprin\u0101\u0161an\u0101. P\u0113c piepild\u012b\u0161anas ar izol\u0101cijas e\u013c\u013cu t\u0101 kop\u0113jais svars p\u0101rsniegs 200 tonnas, un tas b\u016bs aptuveni 10 m augsts, 10 m gar\u0161 un 6 m plats. Transformatora nomin\u0101l\u0101 jauda ir 115 MVA, un tas darbosies ar 330\/33 kV spriegumu.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>Papildus transformatoram K\u012bsas objekt\u0101 jau ir pieg\u0101d\u0101ti un tiek uzst\u0101d\u012bti 39 no 54 akumulatoru konteineriem. \u0160ie 41 tonnu smagie konteineri, kas \u0101r\u0113ji l\u012bdzin\u0101s standarta j\u016bras konteineriem, ir apr\u012bkoti ar modern\u0101m dzes\u0113\u0161anas, apsildes un ugunsdro\u0161\u012bbas sist\u0113m\u0101m.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>\u201cM\u016bsu partneri un komanda ir paveiku\u0161i lielisku darbu. P\u0101rvietot 126 tonnas smagu transformatoru bija sare\u017e\u0123\u012bts un \u0101rk\u0101rt\u012bgi neparasts uzdevums vis\u0101m iesaist\u012btaj\u0101m pus\u0113m. \u0145emot v\u0113r\u0101 pazemes infrastrukt\u016bru b\u016bvlaukum\u0101, \u0161oreiz galvenais izaicin\u0101jums bija maksim\u0101li vienm\u0113r\u012bgi sadal\u012bt slodzi uz grunts. Esmu gandar\u012bts un pateic\u012bgs, ka transformators savlaic\u012bgi non\u0101ca galam\u0113r\u0137\u012b. Tagad ar p\u0101rliec\u012bbu varam raudz\u012bties n\u0101kotn\u0113 un gaid\u012bt akumulatoru parka pabeig\u0161anu,\u201d sac\u012bja Evecon izpilddirektors Karls Kulls.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>\u201cSare\u017e\u0123\u012bt\u0101ko komponentu iepirkums un pieg\u0101de \u0161\u0101da veida projektos ir j\u0101pl\u0101no jau agr\u012bn\u0101 att\u012bst\u012bbas posm\u0101. Tas, ka sare\u017e\u0123\u012bt\u0101s tehnisk\u0101s iek\u0101rtas pieg\u0101de un uzst\u0101d\u012b\u0161ana notiek laik\u0101, ir liels m\u016bsu komandas un partneru pan\u0101kums. Corsica Sole str\u0101d\u0101 atbilsto\u0161i augst\u0101kajiem standartiem, un m\u016bsu kop\u012bg\u0101 pieredze \u013cauj mums soli pa solim veidot strat\u0113\u0123iski noz\u012bm\u012bgu ener\u0123\u0113tikas infrastrukt\u016bru visai Eiropai,\u201d sac\u012bja Corsica Sole izpilddirektors Maikls K\u016bdizj\u0113rs.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>Akumulatoru parka apak\u0161stacija b\u016bs pirm\u0101 Igaunij\u0101, kas elektr\u012bbas p\u0101rvades t\u012bklam tiks piesl\u0113gta ar 330 kV mai\u0146str\u0101vas pazemes kabeli, t\u0101 demonstr\u0113jot inov\u0101cijas un ilgtsp\u0113j\u012bbu infrastrukt\u016bras att\u012bst\u012bb\u0101.<\/p>\r\n<p>&nbsp;<\/p>\r\n<p>Kad parks s\u0101ks darboties, akumulatori nodro\u0161in\u0101s progres\u012bvu t\u012bkla frekvences regul\u0113\u0161anu. Ja t\u012bkla frekvence novirz\u012bsies no normas, akumulatori nekav\u0113joties absorb\u0113s vai atbr\u012bvos elektroener\u0123iju, t\u0101d\u0113j\u0101di saglab\u0101jot l\u012bdzsvarotu un stabilu elektroapg\u0101di vis\u0101 Baltij\u0101.<\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>Kontinent\u0101l\u0101s Eiropas liel\u0101k\u0101 akumulatoru parka izveid\u0113 sasniegta n\u0101kam\u0101&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2515,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[34],"tags":[],"class_list":["post-2628","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-zinas"],"acf":[],"_links":{"self":[{"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/posts\/2628","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/comments?post=2628"}],"version-history":[{"count":4,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/posts\/2628\/revisions"}],"predecessor-version":[{"id":2661,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/posts\/2628\/revisions\/2661"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/media\/2515"}],"wp:attachment":[{"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/media?parent=2628"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/categories?post=2628"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lv\/wp-json\/wp\/v2\/tags?post=2628"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}