{"id":2623,"date":"2025-05-15T13:34:10","date_gmt":"2025-05-15T13:34:10","guid":{"rendered":"https:\/\/evecon.optimist.digital\/evecon-ja-niam-infrastructure-arendavad-latis-110-mw-taastuvenergia-platvormi\/"},"modified":"2026-03-28T15:38:40","modified_gmt":"2026-03-28T15:38:40","slug":"niam-infrastructure-ir-evecon-plecia-110-mw-atsinaujinancios-energetikos-platforma-latvijoje","status":"publish","type":"post","link":"https:\/\/evecon.optimist.digital\/lt\/niam-infrastructure-ir-evecon-plecia-110-mw-atsinaujinancios-energetikos-platforma-latvijoje\/","title":{"rendered":"\u201eNiam Infrastructure\u201c ir \u201eEvecon\u201c ple\u010dia 110 MW atsinaujinan\u010dios energetikos platform\u0105 Latvijoje"},"content":{"rendered":"\r\n<p class=\"wp-block-paragraph\"><strong>\u0160iaur\u0117s \u0161ali\u0173 nekilnojamojo turto investuotoja \u201eNiam Infrastructure\u201c paskelb\u0117 pradedanti antr\u0105j\u012f atsinaujinan\u010dios energetikos platformos pl\u0117tros etap\u0105 Latvijoje, kur\u012f \u012fgyvendina kartu su Baltijos \u0161ali\u0173 \u0161variosios energetikos projekt\u0173 vystytoja \u201eEvecon\u201c. Prasid\u0117jus nauj\u0173 saul\u0117s energijos ir baterij\u0173 kaupimo projekt\u0173 statyboms, bendras platformos paj\u0117gumas i\u0161auga iki daugiau nei 75 MW.\u00a0<\/strong><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">Platformos iniciatyva gim\u0117 2024 m. bir\u017eel\u012f, kai \u201eNiam\u201c ir \u201eEvecon\u201c \u012fk\u016br\u0117 bendr\u0105 \u012fmon\u0119, kurios tikslas \u2013 i\u0161vystyti iki 110 MW \u012frengtos galios saul\u0117s fotovoltines j\u0117gaines ir energijos kaupimo sistemas. \u0160iuo metu art\u0117jama prie pirm\u0173j\u0173 \u0161e\u0161i\u0173 projekt\u0173, kuri\u0173 bendra galia siekia 39,4 MW, statyb\u0173 pabaigos. Planuojama, kad jie prad\u0117s tiekti \u0161vari\u0105 elektros energij\u0105 \u012f tinkl\u0105 2025 m. gegu\u017e\u0119.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">Antrajame pl\u0117tros etape, kurio statybos jau prasid\u0117jo, numatyta \u012fgyvendinti dar keturis projektus, kuri\u0173 bendra galia sudarys 36,3 MW. U\u017ebaigus \u0161\u012f etap\u0105, platformos galia pasieks 75,7 MW. Statyb\u0173 pabaiga numatoma iki 2026 m. pirmojo ketvir\u010dio pabaigos. EPC rangovo funkcijas abiem etapais toliau vykdo \u201eWiSo Engineering\u201c, priklausanti \u201eEvecon Group\u201c.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">\u201e\u0160i pl\u0117tra atspindi m\u016bs\u0173 strategin\u012f tiksl\u0105 investuoti \u012f tvari\u0105 infrastrukt\u016br\u0105, kuri spartina energetikos sektoriaus transformacij\u0105\u201c, \u2013 sako Sverkeris \u00c5kerblomas, \u201eNiam Infrastructure\u201c \u012fk\u016br\u0117jas ir partneris. \u2013 \u201eLatvijos rinka ir palanki reguliacin\u0117 aplinka sudaro s\u0105lygas ilgalaik\u0117s vert\u0117s k\u016brimui, tod\u0117l d\u017eiaugiam\u0117s gal\u0117dami pl\u0117sti bendradarbiavim\u0105 su \u201eEvecon\u201c \u0161iame regione.\u201c<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">\u201ePartneryst\u0117 su \u201eNiam\u201c padeda mums \u017eengti dar didesniu \u017eingsniu link ambicingo tikslo \u2013 plataus masto \u0161variosios energijos pl\u0117tros\u201c, \u2013 komentuoja \u201eEvecon\u201c generalinis direktorius Karlas Kullas. \u2013 \u201eTikim\u0117s s\u0117kmingai \u012fgyvendinti \u0161\u012f etap\u0105 ir toliau kurti atsparias, ateities i\u0161\u0161\u016bkius atitinkan\u010dias energetikos sistemas Baltijos regione.\u201c<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">\u201eEvecon\u201c \u2013 did\u017eiausia privati energetikos \u012fmon\u0117 Baltijos \u0161alyse, valdanti daugiau kaip 2,7 GW projekt\u0173 portfel\u012f. Daugiausia d\u0117mesio skiriama baterij\u0173 kaupimo, saul\u0117s bei v\u0117jo energetikos pl\u0117trai. Tarp ambicingiausi\u0173 bendrov\u0117s projekt\u0173 \u2013 did\u017eiausias Baltijos \u0161ali\u0173 saul\u0117s parkas ir \u0161iuo metu statomas baterij\u0173 parkas, kuris taps did\u017eiausiu visoje \u017eemynin\u0117je Europoje.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><b><span data-contrast=\"auto\">Apie \u201eNiam Infrastructure\u201c<\/span><\/b><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">\u201eNiam Infrastructure\u201c investuoja \u012f tvarius projektus atsinaujinan\u010dios energetikos, transporto ir telekomunikacij\u0173 srityse \u0160iaur\u0117s \u0161alyse ir visame \u0160iaur\u0117s Europos regione. Pirmasis \u012fmon\u0117s fondas orientuotas \u012f ma\u017e\u0173 ir vidutinio dyd\u017eio investicij\u0173 portfel\u012f, akcentuojant tvari\u0173 infrastrukt\u016bros objekt\u0173 agregavim\u0105 ir rizik\u0173 diversifikavim\u0105. Investicijas remia Europos S\u0105jungos \u201eInvestEU\u201c fondas. Pasitelkdama inovacijas, gil\u0173 rinkos supratim\u0105 ir glaud\u0173 bendradarbiavim\u0105 su partneriais, \u012fmon\u0117 prisideda prie \u017ealesn\u0117s ir tvaresn\u0117s ateities k\u016brimo.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n<p><span data-contrast=\"auto\">Projektas finansuojamas pagal Europos S\u0105jungos \u201eInvestEU\u201c fond\u0105.<\/span><span data-ccp-props=\"{&quot;335551550&quot;:6,&quot;335551620&quot;:6}\">\u00a0<\/span><\/p>\r\n","protected":false},"excerpt":{"rendered":"<p>\u0160iaur\u0117s \u0161ali\u0173 nekilnojamojo turto investuotoja \u201eNiam Infrastructure\u201c&#8230;<\/p>\n","protected":false},"author":1,"featured_media":2513,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[273],"tags":[],"class_list":["post-2623","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uudis"],"acf":[],"_links":{"self":[{"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/posts\/2623","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/comments?post=2623"}],"version-history":[{"count":1,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/posts\/2623\/revisions"}],"predecessor-version":[{"id":2723,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/posts\/2623\/revisions\/2723"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/media\/2513"}],"wp:attachment":[{"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/media?parent=2623"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/categories?post=2623"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/evecon.optimist.digital\/lt\/wp-json\/wp\/v2\/tags?post=2623"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}